The reconstruction of the tracks and platforms at Čachovice railway station falls within the pilot projects of using BIM in designing railway structures. This is the second construction on the Nymburk – Mladá Boleslav section.
As one of the control mechanisms, we chose to use state-of-the-art data collection methods. These included in particular imaging using unmanned aerial vehicles (drones) and ground-based laser scanning. Aerial photography was always carried out after the completion of the specified phases of work.
Output Data Format: RVT, IFC

.jpg)
.jpg)
.jpg)
.webp)


.jpg)
